Thorndon Cook Power
   
Thorndon Cook Power
Thorndon Cook Power
Phú Mỹ 2.2 CCGT Power Plant

Japanese ORC Due Diligence

Small Japanese ORC Plant

The Project

TCP was engaged by Owl Ltd to undertake a 3rd party independent due diligence evaluation of the proposal to install ORC generating plants as part of a small scale geothermal development.

TCP scope included an evaluation on the size and suitability of the resource, a review of the proposed power plant package together with a review of the Capex and Opex.

Our Role

  • Review and comment on the size and quality of the resource
  • Review and comment on the Power plant package chosen
  • Review the performance of the units.
  • Review the Capex and Opex for the units
  • Review of any environmental impacts

Results

The work by Thorndon Cook provided the client with an independent third party assessment of the units and their performance.

Capabilities

Discipline:
mechanical engineering

Role:
due diligence studies

Contact Us: for general inquiries info@thorndoncook.com - or contact one of our directors
Site by: @URL - Copyright © 2015 Thorndon Cook Ltd - Privacy Policy