Wayang Windu Geothermal Power Station

Patuha Front End Engineering Design (FEED)

  • ClientWiratman & Associates
  • Date2009 to 2010
  • LocationJakarta, Indonesia
  • Project ValueUS$550,000

  • Thorndon Cook Staff
  • Charles Zhang

The Project

Wiratman & Associates required front-end engineering design (FEED), to determine key project parameters for the steamfield piping system and power plant for a proposed new 1 x 55 MW geothermal power station in south-west Java. It was proposed that the development employ standard single-flash technology, with steam turbine condenser cooling provided by a mechanical draught cooling tower.

Our Role

Using relevant well output data, meteorological data and site visits, Thorndon Cook Power staff were involved with developing a model to optimise the sizing of crucial steamfield piping and power plant components. We then used outputs from the model to refine plant layouts and to provide basic specifications for those components.

Once the above was completed, we prepared the engineering, procurement and construction (EPC) technical specifications for both the steamfield and power plant.

Results

We delivered a robust and efficient concept design and technical specifications, which were used as the basis of the EPC contract for the design and construction of the steamfield and 55 MW power plant.